Tuesday, July 27, 2021

2010 Mercedes Benz C 300 (204.054) V6-3.0L (272.947) Page 2537


YES



Test voltage supply of circuit 87.



Operation number of operation texts and work units or standard texts and flat rates:26-0641Test sequence



- Switch off ignition.



- Connect socket box to component N15/6 (Sprintshift control module).



- Measure direct voltage with multimeter between sockets (A.30) 30 and (A.29) 29 of the 126-pole socket box tester.



- Switch on ignition.



Specified value



- Voltage[11.0...14.5] V



Question



- Is the measurement value OK?